Well done to our mobilized team!
This project was made possible thanks to the commitment and complementary skills of our teams!
As part of the resumption of operations at the aviation facility at Annecy Haute-Savoie Mont-Blanc Airport, TotalEnergies has entrusted us with the full project management of a strategic initiative to expand and optimize the facilities at a site managed by VINCI Airports. Our mission: to support the facility’s evolution to meet new regulatory requirements and address the challenges of sustainable mobility.
We managed the entire project lifecycle, from design through to commissioning:
Detailed design (APD/DCE),
Contractor selection (ACT),
Construction supervision (VISA, DET, OPC, AOR, DOE),
Administrative support (preliminary declaration, ENEDIS connection).

We studied, designed, and coordinated:
The expansion of fuel storage,
The creation of a new multi-fuel distribution station (including diesel),
The complete renovation of unloading, loading, and sampling facilities,
The installation of an electric charging station for aircraft,
The creation of a fuel station for refueling vehicles,
Installation of a modular building such as ALGECO,
The creation of a loading/unloading pump station.
This project involved numerous trades: civil engineering, roadworks, general installation, piping, electricity, and automation.
Our cutting-edge technical expertise in airport storage and refueling stations,
Our mastery of aviation fuel regulations and TotalEnergies standards,
The creation of a 3D model to facilitate coordination,
Our local presence, invaluable for monitoring the project.
This project was made possible thanks to the commitment and complementary skills of our teams!